ONLINE OPEN HOUSE: October 18 – December 31

Terminal 5 Improvements
  • Welcome
  • Background
  • Environmental Review
  • Preferred Alternative
  • Mitigation
  • Key Changes: Draft to Final
  • Library
  • Next Steps
  • Language Help

Resources

  • SEPA Overview
  • SEPA Notice of Determination of Non-significance (DNS) (55 KB PDF)
  • Withdrawal of DNS and Issuance of New SEPA Determination of Significance (DS) (.9 MB PDF)
  • Terminal 5 Environmental Checklist (1 MB PDF)
  • Terminal 5 Improvements Fact Sheet (1.1 MB PDF)
  • VIDEO: Pile Driving Rapid Load Testing at Terminal 5

News

  • A fisherman's account of seeing the giant Benjamin Franklin ship pull into Elliott Bay, Puget Sound Business Journal, 2/29/2016
  • Largest container ship ever to visit U.S. arrives in Seattle, KOMO 4 News, 2/29/2016
  • Massive cargo ship arrives in Seattle’s Elliott Bay, The Seattle Times, 2/29/2016
  • Megaship makes a port call in Seattle, Seattle Post-Intelligencer, 2/29/2016
  • VIDEO: Giant cargo ship docks in Seattle, KIRO 7 News, 2/29/2016

Scoping

  • Public Scoping Meeting Flyer (.7 MB PDF)
  • Public Scoping Meeting Guide (.1 MB PDF)
  • Public Scoping Meeting Display Boards (39 MB PDF)
  • Public Scoping Meeting Presentation (.5 MB PDF)
  • Public Scoping Comments (8 MB PDF) 

Draft EIS

  • Draft EIS Notice of Availability (.7 MB PDF)
  • Port of Seattle SEPA/NEPA Documents
  • Draft EIS, Volume I (12.9 MB PDF)
  • Draft EIS, Volume II (14 MB PDF)
  • Draft EIS Public Hearing Notice (1.1 MB PDF)
  • Draft EIS Meeting Guide (.1 MB)
  • Draft EIS Meeting Display Boards (4.7 MB)
  • Draft EIS Meeting Presentation (2.3 MB)
  • Draft EIS Public Comments (20 MB)

Final Environmental Impact Statement (EIS)

  • Final EIS Notice of Availability
  • Final EIS Press Release
  • Final EIS (Volumes 1 and 2)

Sign up for Terminal 5 Project email updates




For more information

NWSA Terminal 5 Improvements Project

Share this site with others

Copyright ©2022 EnviroIssues